Tuesday 7 June 2011

1/06/11

Down at the site today putting up our scaffolding for our unitec house, using poles as ledges, rails braces,temporary and standard posts.We scaffolded  the perimeter of our building at about the height were our first nogs are on the wall frames, worked at that height right around the house connecting each pole with coupler connecters.

After break we continued on our process of scaffolding through the day and braced the sides for extra support. we also ran a few ledges along the standards for hand rails for safety.
Put up the planks and had them laid on the metal poles and nailed so they wont move and fall off the poles.